LIVE VIDEO: NewsChannel 5 at Five    Watch
 

Two Lambert Airport Terminal 1 entrances get a makeover

10:51 AM, Nov 5, 2012   |    comments
Lambert Airport Terminal 1 rendering
  • Share
  • Print
  • - A A A +

St. Louis (KSDK) -- Two entrances at Lambert Airport Terminal 1 will get a makeover.

The damage from the April 22, 2011 tornado created the opportunity for the redesign.

The entrances will be glass-enclosed walkways that will brighten the pathway to and from the lower level bag claim.

The project is expected to be finished in the spring of 2013.  The terminal entrances reconstruction is part of the overall tornado restoration campaign by the Airport totaling approximately $22 million.

Most Watched Videos